Hevacomp User Manual V26 - Mechanical Designers Manual

The descriptions under the Emit Section under the heading Pipes and Ducts are incorrect. Under each heading description about u-Values are detailed. Please will you correct the manual?

Parents Reply
  • Hi Shane,

    Thanks. Can I ask you a couple of questions. Reading into OpenBuildings info, is this essentially for buildings that are designed using BIM projects only?

    Also, as a new user of Hevacomp, I encountered issues when designing the heating and hws/cws systems for a two-storey building, particularly when converting a CAD drawing to DXF for the different floor levels and importing them in the Netsys Heating, CWS and HWS as appropriate. The imports for the different floor levels never overlaid one on top of the other and hence my floor connectors never matched. Is it better to add Floor 0 and then copy Floor 0 and re-name it to Floor 1 and then alter the Floor 1 layout or am I missing something? 

    Sean

Children