• How To Create A Custom Cable Type

    I can't Find anything explaining how to create a custom cable type. From the " How to move customised Cable Files to a new version " I under stand the first window but the bottom half of this second window I don't really under stand what the initial…
  • Hager Invicta 3 Type B 125a Dual metered board

    Hi, When selecting the above board type and no. of ways 4/16, this only inserts a 8 way DB? Regards Karl
  • Hevacomp Electrical systems - Twin and earth cable for 3phase

    Hi, I am working on a project where a contractor has used 2No 4mm twin and earth cables to feed a 32A TP&N 5pin socket. I need to run a cable calc to reflect his installtion. Is it possible, using Hevacomp Connect, to run a cable calc based on the…
  • Print the Discrimination Report

    Is there a way to print of the discrimination report? I have found it in the reports section but the option to click OK is greyed out. My client needs a print out of the earth fault and overload graphs which I can do to PDF.
  • Large loss of PSCC across first leg of circuit from Transformer to Main switchboard

    Afternoon all I hope someone can shed some light on what i think is a problem with hevacomp connect, i am currently working on a large project and at the transformer, we have a fault current of 24kA but 10m upstream we have a fault current of 7.9kA…
  • Derate XLPE cables to run to a maximum of 70 deg instead of 90 deg

    Hi, Please can anyone tell me the best way to derate XLPE cables to run to a maximum of 70 degrees instead of 90? Thanks
  • Electrical Design, Strike programme, risk assessment always deems a system to be necessary and always indicates that no solution is available.

    Electrical Design, Strike programme, measures to protect against lightning. I have attempted to carry out a risk assessment and develop mitigation measures using this programme. However it seems that no matter which values I change the calculated risk…