• XML Generation for EPC

    I've been trying since 6PM GMT to generate an xml for EPC lodgement. Its now 12AM GMT and still nothing. The latest upgrade is installed. This needs lodging by 12PM 26/09. Anybody any pointers?
  • Hevacomp Energy Assessor course and exam - London, May 2018

    Hevacomp Energy Assessor (Non-dwelling) Level 3 & 4 (SBEM) Allows Hevacomp users - via an accredited Energy Assessor scheme provider - to work towards Energy Assessor status to show competency in production of EPC's using an approved SBEM interface…
  • Hevacomp Part L Energy Assessor course and exam - September 2017

    Hevacomp Energy Assessor (Non-dwelling) Level 3 & 4 (SBEM) Allows Hevacomp users - via an accredited Energy Assessor scheme provider - to work towards Energy Assessor status to show competency in production of EPC's using an approved SBEM interface…
  • Hevacomp Part L Energy Assessor courses: Now open for registration

    Hevacomp Energy Assessor (Non-dwelling) Level 3 & 4 (SBEM) Allows Hevacomp users - via an accredited Energy Assessor scheme provider - to work towards Energy Assessor status to show competency in production of EPC's using an approved SBEM interface…
  • Part L (Simulation) not recognising changes made within Part L (Design Database)

    Hi have just been modelling a building - Level 5 EPC and I have been adjusting the air permeability and lighting information within Part L design database. Once I had the building 'passing' within Part L Simulation - I then went back into Part L design…