It may sometimes be necessary to fix the size of a rising pipe or duct section in the Netsys program.
On the face of it, it may appear difficult to fix the size of riser pipe (or duct) in the Netsys program, however following these guidelines should help.
Consider the example below. Here we have a simple CWS project with a riser to floor change connector:
In this example, the riser has sized to 22m, but we wish to fix it at 15mm. To enable us to select the riser correctly, we need to set the pipe height to somewhere between the lower and upper position of the pipe. In this instance the lowest point of the pipe is .45m and the highest point is 3m. Our mid point is 1.7m.
From the Pipes menu, select the Defaults option. Now choose the "Special Height" from the dialog and set it to our mid point height (1.7m). Close the dialog and select the Fix/unfix pipes option from the Pipes menu.
While in Fix/unfix mode, RIGHT click as near to the center of the riser section as possible. It will help if you zoom into this area before trying to select the riser point.
If you select the area correctly, you will see a coloured dot highlighted in the center of the riser/floor change connector marker as in the zoomed image below. Once the section is correctly selected you can set the parameters of the section, as required.
Product TechNotes and FAQs
Building Product TechNotes And FAQs
Bentley homepage
HevacompMechanical Designer
Bentley Technical Support KnowledgeBase
Bentley LEARN Server
Bentley's Technical Support Group requests that you please confine any comments you have on this Wiki entry to this "Comments or Corrections?" section. THANK YOU!