It has been noted that there is a discrepancy between the Primary Energy figure on the BRUKL report and that generated by the BREEAM New Construction ENE01 Compliance Checker.
BRE have made this statement:
"Differences in the figures for the BRUKL and BREEAM documents are due to a difference in the scope for the energy value. Current versions of the approved building energy modelling software calculate energy consumption on the basis of delivered energy, not primary energy, so it will not be possible to use the figures reported in the BRUKL Output Document (technical data sheet) to accurately determine the number of BREEAM credits achieved. Until such time as the next version of the National Calculation Methodology is revised to include primary energy, BREEAM assessors and consultants will need to upload their BRUKL output files to the BREEAM Compliance Checker website to accurately calculate and verify the three EPRs for demand, consumption and CO2 and the number of BREEAM credits achieved.'
(See section CN7 of this document)