Bentley Communities
Bentley Communities
  • Site
  • User
  • Site
  • Search
  • User
  • Welcome
  • Products
  • Support
  • About
  • More
  • Cancel
Hevacomp
  • Product Communities
  • Building
  • Hevacomp
  • More
  • Cancel
Hevacomp
Hevacomp Wiki BRUKL and ENE01 Compliance Checker differences
    • Sign in
    • +Hevacomp General Information
    • +Hevacomp Dynamic Simulation
    • +Hevacomp Electrical Designer
    • -Hevacomp Mechanical Designer
      • +Design Database - Hevacomp Mechanical Designer
      • +Mechanical Design - Hevacomp Mechanical Designer
      • +Netsys - Hevacomp Mechanical Designer
      • -PartL - Hevacomp Mechanical Designer
        • Actual Emission Rate (BER) displayed as zero
        • Alpha Values and Thermal Bridging
        • An important note on the PartL calculation
        • Auxiliary Energy - an explanation
        • BRUKL and ENE01 Compliance Checker differences
        • BRUKL Compliance Report Project Name
        • Calculating hot water demand
        • Cannot lodge XML - Insurer details are missing
        • Cannot select Display Lighting
        • CHP will not connect to an HWS sysytem
        • Compliance report is not generating - option is 'greyed out'
        • Consideration of shading factors
        • Considering ground floor U-values
        • Defining air permeability
        • Defining Door Types
        • Defining solar collectors
        • District heating is displayed in BRUKL report, none selected
        • Energy Consumption on BRUKL report
        • Entering non-standard HVAC systems
        • EPBD Recast - Specifying alternative forms of energy
        • EPC and Recommendations menus
        • EPCGEN Error, no compliance report and blank results
        • EPCgen.net Activation Code
        • Excessive thermal bridging
        • External doors missing from BRUKL report
        • Fuel Heating Type
        • General Lighting output in compliance report
        • Glazing area differences
        • Glazing Light Transmittance in Part L Results
        • Heating System Controls greyed out
        • Hostel room types reverting to 24x7 Bedroom after definition
        • Inputting DHW Generator Seasonal Efficiency
        • Inputting SFP for fan coils
        • Internal Surfaces appearing in PartL U-Value checks
        • Keyword out of range: Heat SSEFF error
        • Lighting results do not match input data
        • Notional Auxiliary Energy requirements increase when using HEPA filters
        • Occupancy gains may appear different
        • Omitted Recommendations shown in Recommendations Report
        • Partition Centre Lines
        • PartL 2010 and 2013 in the same project
        • Potential Measures for Scottish EPC's
        • Power Factor and Lighting Controls
        • Project data changing after loading project into different software versions
        • Renewable fuel sources
        • Result changes between 2006, 2010 and 2013 regulations
        • Room Types and the NCM Database
        • Shell and Core Building Services can cause an error
        • The BRUKL document is listing an unexpected building type
        • The NCM modelling guide
        • Thermal Bridging/PSI values
        • Usage of Biofuels
        • U-value check in Compliance Report
        • U-Value checks not carried out
        • Version 25/26 change over notes for PartL
        • Watermarks on SBEM output documents
        • XML document is not produced
        • Zone data isn't imported into PartL 2013
      • +System Builder - Hevacomp Mechanical Design
    • +Installation and activation
    • +Troubleshooting
    • +Windows tips and tricks
    • Working From Home with Hevacomp

     
     Questions about this article, topic, or product? Click here. 

    BRUKL and ENE01 Compliance Checker differences

      Product(s): Hevacomp Mechanical Designer
      Version(s): V8i (N/A)
      Environment: N/A
      Area: N/A
      Subarea: N/A

    Overview

    It has been noted that there is a discrepancy between the Primary Energy figure on the BRUKL report and that generated by the BREEAM New Construction ENE01 Compliance Checker.

    BRE have made this statement:

    "Differences in the figures for the BRUKL and BREEAM documents are due to a difference in the scope for the energy value. Current versions of the approved building energy modelling software calculate energy consumption on the basis of delivered energy, not primary energy, so it will not be possible to use the figures reported in the BRUKL Output Document (technical data sheet) to accurately determine the number of BREEAM credits achieved. Until such time as the next version of the National Calculation Methodology is revised to include primary energy, BREEAM assessors and consultants will need to upload their BRUKL output files to the BREEAM Compliance Checker website to accurately calculate and verify the three EPRs for demand, consumption and CO2 and the number of BREEAM credits achieved.'


    (See section CN7 of this document)

    • Hevacomp Mechanical Designer
    • Compliance Checker ENE01
    • BRUKL
    • BRE
    • PartL
    • BREEAM
    • Share
    • History
    • More
    • Cancel
    • Duncan Brown Created by Duncan Brown
    • When: Tue, Mar 8 2016 11:53 AM
    • Shane Regan Last revision by Bentley Colleague Shane Regan
    • When: Mon, Aug 24 2020 5:13 AM
    • Revisions: 7
    • Comments: 0
    Recommended
    Related
    Communities
    • Home
    • Getting Started
    • Community Central
    • Products
    • Support
    • Secure File Upload
    • Feedback
    Support and Services
    • Home
    • Product Support
    • Downloads
    • Subscription Services Portal
    Training and Learning
    • Home
    • About Bentley Institute
    • My Learning History
    • Reference Books
    Social Media
    •    LinkedIn
    •    Facebook
    •    Twitter
    •    YouTube
    •    RSS Feed
    •    Email

    © 2021 Bentley Systems, Incorporated  |  Contact Us  |  Privacy |  Terms of Use  |  Cookies