A requirement to enter Potential Measures has been introduced as part of the 2013 Scottish regulations. This is so that a potential asset rating can be displayed with the recommendations.
An XML file will only be generated if the type of EPC has been set to Potential, and the relevant potential measures added.
Further information on this can be found in the iSBEM 5.2g manual, (available here)
To enter the potential measures and produce an XML file:
It should be noted that while in "Potential Measures" mode, changes to some input fields will not be registered. This is by design. To change project information, ensure you are in the Baseline scenario, with the Type of EPC set to Actual.