Bentley Communities
Site
Search
User
Site
Search
User
Product Communities
SYNCHRO Construction Solution
SYNCHRO 4D Wiki
10.01.01.51 April 2020
Sign In
Features - SYNCHRO 4D Pro
Learning Resources
-
SYNCHRO 4D Wiki
+
SYNCHRO 4D Pro
-
SYNCHRO Modeler
+
What's new
+
SYNCHRO Modeler - Guide
+
SYNCHRO Modeler - FAQ
-
SYNCHRO Modeler - Known Issues
10.03.05.68 November 2022
10.03.03.56 December 2021
10.03.02.39 July 2021
10.03.01.48 April 2021
10.03.00.10 January 2021
10.02.00.43 August 2020
10.01.01.51 April 2020
10.01.00.23 January 2020
+
SYNCHRO 4D Schedule API
Upgrading from SYNCHRO Pro (and SWP) to 4D Pro (and Control)
Questions about this article, topic, or product? Click here.
10.01.01.51 April 2020
Known issues
There is no upgrade path for user data.
New product versions do not support data from previous versions and no upgrade path is possible.
Multi-users conflict resolution is not supported.
Cost code assignment and slicing operation conflicts are not handled and can result in incorrect data and geometry.
Volume is not calculated for some Earthworks and Fill elements.
Performance decline on bulk operations (above 1000) or when total assignments count is above 5000.
Instant crashes possible especially on decent machines with huge models and intensive usage.
Calculated volume of sliced components is different compared to the volume of the same components before the slice. It is usually smaller than 0.001% and should never be greater than 0.01%. Volume calculated before the slice is the correct one.
Sometimes volume value is not calculated for one or two pieces of the sliced component, when the slice is performed on a curved or bent component
Unit of measurement abbreviation in column "UOM" (in "Reporting" grid)
does not change when calculated quantity is converted to another UOM using "Convert to" functionality. This issue is seen also in the exported CSV file.
Order of assigned components is different in the "Reporting" grid and exported CSV file:
in the "Reporting" grid, components are not listed alphabetically .
in the exported CSV file,
components are listed alphabetically.
Order of assigned work-steps is different as well:
in the "Reporting" grid, work-steps are listed alphabetically.
in the exported CSV file, work-steps are listed according to work step code.
Order in Summary list is different as well:
in the "Summary" grid, work-steps are listed alphabetically.
in the exported CSV file, work-steps are listed according to Total value.
"Cannot install SYNCHRO Modeler. Construction Modeler is already installed." means that an older version of Construction Modeler product is installed on the machine. Uninstall the older version from Add/Remove programs. If it is missing there, it means that there are some leftover files in these two locations: $LocalAppData\Programs\construction-modeler\*.* OR $PROGRAMFILES64\Bentley\Construction Modeler\*.*. Remove any leftover files from these locations to install SYNCHRO Modeler.
Share
History
More
Cancel
Created by
Rasa Sumauskiene
When:
Mon, Mar 30 2020 12:55 AM
Last revision by
Rasa Sumauskiene
When:
Fri, Nov 25 2022 1:49 AM
Revisions:
11
Comments:
0
Recommended
Related