When performing safety analysis to check FOS of a anchored excavation (with diaphragm wall piles for example),via Pfi/C reduction method, if we check the force or moment in structure elements its considerably high and is far beyond capacity of structure.
anyone has any idea is it wrong or not?should we introduce elasto-plastic structure element for safety analysis as a solution?