Dear Plaxis,
I am running the fully coupled stress defromation analysis of a staged construction tailings dam. I have questions regarding the initial water table condition in simulating this staged construction .
Basically, I used to different ways to set the initial water level
1) draw differnt water level and then use different global water levels at the top surface of each added tailings layer, and chose "phreatic" in the consolidation calculation.
In this case, as phreatic is used, does it mean only the newlyed added tailings layer is hydrostatic pressure, and the excess pore pressure in the previously deposited tailings will still be kept?
2) Set only one global water table at the top surface of the first tailings layer, and chose "use pressure from the previous phase" for the consolidation calculation of the subsequent newly added tailings layers.
In this case, I do not understand why the waste rocks (started from the second layer) are always dry and no water is entering into the waste rock dykes during the calculation. I also want to see the flow between the tailings and waste rock. how can we set that in plaxis2d?
The drainage type is "undrained A" for tailings and "drained" for wsate rock. In the Groundwater section, I used user defiend-saturated model for both tailings and waste rock, is this okay?
Thank you,