Tunnel lining surface does not follow the soil surface.

Hi Dennis, 

I also have a similar issue. As you can see in the picture, there is a tunnel which continues beyond the blue plate. Behind the blue plate, there is concrete volume for a certain thickness, thereafter it is the soil till the end of model. But I can see there is a certain protrusion of soil when the soil is being excavated as shown in second picture. As a result in the output I can see a bit of soil protruding into the tunnel lining plate although the tunnel lining plate completely continues from the blue plate to the end of model. The excavation stage also converges. What can be the reason for this protrusion as a result, soil ingression although it is not modelled in the staged construction. I can se this soil protrusion in mesh as well.  Can you please help ?

 : the tunnel being zoomed in : 

Parents Reply Children
No Data