How does Plaxis model Rate of Excavation in Consolidation calculation?

I am using Plaxis to model heave of a large cutting.

The cutting will be excavated over a period of several weeks. If I create a phase where I deactivate the material to be excavated and use the consolidation calculation type and set a time equivalent to the duration of excavation, how is this modelled in Plaxis?

- Does Plaxis assume it is all instantaneously removed and then held empty for the specified time? (Test calculation suggests no)

- Does Plaxis assume a constant rate of excavation during the specified time? (The speed of calculation suggests no)

- Something in between - e.g. all excavated at half time / quarter excavated every quarter time etc?

- Another method?

I expect this is detailed in the manual so would also be happy to be directed to the relevant section.

Thank you,

Rebecca 

(P.S. Apologies for two question in a day!)