• Drain: Factors depend Groundwater head drawdown

    Hi all, I modeled a drain with a normal behavior (starting from y=15m to y=12m). I provided the groundwater head of the drain as h=12m. I did the steady state flow analysis and thought the groundwater would be drawdown to h=12m from h=15m. But in the…
  • 2D Dewatering with Well - Determine the required flow rate and 3D influences in a 2D calculation

    Hi I want to discuss with you two topics, regarding a dewatering with wells of an excavation using 2D Plaxis Steady state Groundwater flow analysis. Left boundary is Closed due to the half-symmetrical modelling. First: How do we determine the necessary…