Tutorial 5: Construction of a road embankment in Plaxis 2D tutorial maual 2020

Hi all and

I have 2 questions in this tutorial

01. For the drain, why the head is defined at 0m as phreatic line at 1m? 

02. For the normal analysis they used time interval as 2,30 and 1 days and for analysis using drain they have used 1 day time interval , does it time interval based on the project requirement as they need to do construction quickly or any influence on the time? and graph shows excess pore pressure not reach the maximum as in the normal analysis (as role of the drain is speed up the consolidation and it need to remove the all excess pressure), why like that (as time depends, if so we can increase the time know, why provide only 1day time interval)?

Thanks.