Hi all,
When doing an axisymmetric excavation, please how to provide water table (assume initial water table at the top surface? (for this project need to check the full water condition on the retained side so can't use steady flow for water table).
I asked this question because when i provide 2 separate water levels and did analysis the meeting point of these 2 produces tension points because change in the active pore pressure as shown below.
<= This is how i provided 2 water levels and excavation step
Thanks.
Dear Nitha,
I think you can check the on-demand video about the common pitfalls on performing dewatering analyses: https://learn.bentley.com/app/VideoPlayer/LinkToIndividualCourse?LearningPathID=113626&CourseId=129954&MediaID=5019074
For project-specific questions we can assist you via a support service request: https://apps.bentley.com/srmanager/ProductSupport
Dear Mr. Stefanos,
Thanks, will check