This document describes an example that has been used to verify the groundwater flow capabilities of PLAXIS. Concrete dams with three different underground construction strategies are considered: one without an impermeable screen, one with an impermeable screen at the upstream side and one with an impermeable screen at the downstream side.
Used version:
Confined flow around an impermeable wall
[Verifications]