Bentley Communities
Bentley Communities
  • Site
  • User
  • Site
  • Search
  • User
  • Welcome
  • Products
  • Support
  • About
  • More
  • Cancel
PLAXIS | SOILVISION
  • Product Communities
  • More
PLAXIS | SOILVISION
PLAXIS | SOILVISION Wiki PLAXIS 2D Tutorial 09: Excavation and dewatering
    • Sign in
    • -PLAXIS Wiki
      • +Geotechnical SELECT Entitlements [GSE]
      • -PLAXIS
        • +Software and License - PLAXIS
        • -Documentation - PLAXIS
          • +Manuals - PLAXIS
          • -Tutorials - PLAXIS
            • -Tutorials PLAXIS 2D
              • PLAXIS 2D Tutorial 01: Settlement of a circular footing on sand
              • PLAXIS 2D Tutorial 02: Drained and undrained stability of an embankment
              • PLAXIS 2D Tutorial 03: Submerged construction of an excavation
              • PLAXIS 2D Tutorial 04: Settlements due to tunnel construction
              • PLAXIS 2D Tutorial 05: Excavation of an NATM tunnel
              • PLAXIS 2D Tutorial 06: Dry excavation using a tie back wall
              • PLAXIS 2D Tutorial 07: Dry excavation using a tie back wall - ULS
              • PLAXIS 2D Tutorial 08: Construction of a road embankment
              • PLAXIS 2D Tutorial 09: Excavation and dewatering
              • PLAXIS 2D Tutorial 10: Cyclic vertical capacity and stiffness of circular underwater footing
              • PLAXIS 2D Tutorial 11: Flow through an embankment
              • PLAXIS 2D Tutorial 12: Potato field moisture content
              • PLAXIS 2D Tutorial 13: Stability of dam under rapid drawdown
              • PLAXIS 2D Tutorial 14: Dynamic analysis of a generator on an elastic foundation
              • PLAXIS 2D Tutorial 15: Pile driving
              • PLAXIS 2D Tutorial 16: Free vibration and earthquake analysis of a building
              • PLAXIS 2D Tutorial 17: Thermal expansion of a navigable lock
              • PLAXIS 2D Tutorial 18: Freeze pipes in tunnel construction
            • +Tutorials PLAXIS 3D
            • Slope stability for road construction project: using FEM and LEM
          • +Verifications - PLAXIS
        • +API / Python scripting - PLAXIS
        • +Known issues - PLAXIS
        • +Models - PLAXIS
        • +Tips and Tricks
        • +Publications
        • +Videos - PLAXIS
      • +PLAXIS LE
      • +PLAXIS Monopile Designer
      • +SOILVISION
      • +Subscription Entitlement Service
    • +Working from home with PLAXIS
    • +Working from home with PLAXIS LE

     
     Questions about this article, topic, or product? Click here. 

    PLAXIS 2D Tutorial 09: Excavation and dewatering

    Application PLAXIS 2D
    Version PLAXIS 2D
    Date created 20 May 2017
    Date modified 16 May 2022

    In this tutorial lowering the groundwater level and the flow around a sheetpile wall will be analysed. The geometry model of Tutorial 06 will be used. The well feature is introduced in this example.

    This exercise requires a PLAXIS 2D Advanced or PLAXIS 2D Ultimate license.

    The attached *.p2dxlog file contains all the commands to generate the model. With a Bentley Geotechnical SELECT Entitlement [GSE] licence, you can use the commands runner to open the *.p2dxlog file and to execute all commands in one go, see also this instruction.

    Downloads

    • Green book PLAXIS 2D CE V22.01 - Tutorial 09.pdf - instructions
    • Notepad spiral PLAXIS 2D CE V22.01 - Tutorial 09.p2dxlog [command log file]
    • Green book PLAXIS 2D CE V22 - Tutorial 09.pdf - instructions
    • Notepad spiral PLAXIS 2D CE V22 - Tutorial 09.p2dxlog [command log file]
    • Green book PLAXIS 2D CE V21 - Tutorial 09.pdf - instructions
    • Notepad spiral PLAXIS 2D CE V21 - Tutorial 09.p2dxlog [command log file]
    • PLAXIS 2D 2018 - Tutorial Lesson 10.pdf
    • PLAXIS 2D 2018 - Tutorial Lesson 10.p2dxlog [command log file]

    See also

    PLAXIS 2D Tutorial 06: Dry excavation using a tie back wall    [Tutorials]


    PLAXIS 2D Tutorial 07: Dry excavation using a tie back wall - ULS    [Tutorials]


    PLAXIS 2D Tutorial 08: Construction of a road embankment    [Tutorials]


    PLAXIS 2D Tutorial 10: Cyclic vertical capacity and stiffness of circular underwater footing    [Tutorials]

    • Well
    • Tutorial
    • Groundwater
    • flow around
    • sheet pile wall
    • PLAXIS
    • PLAXIS 2D
    • excavation
    • Groundwater flow
    • Share
    • History
    • More
    • Cancel
    • Micha van der Sloot Created by Bentley Colleague Micha van der Sloot
    • When: Wed, Dec 18 2019 10:42 AM
    • Felipe Fonseca Last revision by Bentley Colleague Felipe Fonseca
    • When: Mon, May 16 2022 2:22 PM
    • Revisions: 6
    • Comments: 0
    Recommended
    Related
    Communities
    • Home
    • Getting Started
    • Community Central
    • Products
    • Support
    • Secure File Upload
    • Feedback
    Support and Services
    • Home
    • Product Support
    • Downloads
    • Subscription Services Portal
    Training and Learning
    • Home
    • About Bentley Institute
    • My Learning History
    • Reference Books
    Social Media
    •    LinkedIn
    •    Facebook
    •    Twitter
    •    YouTube
    •    RSS Feed
    •    Email

    © 2021 Bentley Systems, Incorporated  |  Contact Us  |  Privacy |  Terms of Use  |  Cookies