PLAXIS 2D AE.00/ 2D AE.01: When using a Dynamic phase in combination with other phases with a time interval (phase either being time dependent such as consolidation phases or simply a plastic phase with a time interval) results may become incorrect. This issue is caused by an incorrect transfer of the time interval to the calculation kernel.
This issue is now solved in PLAXIS 2D AE.02