Sequencing definition with fixed tunnel face


ApplicationPLAXIS 3D
VersionPLAXIS 3D
Date created18 April 2017
Date modified18 April 2017
www.youtube.com/watch

This movie shows the difference for the tunnel excavation in staged construction when using the default continuous propagation of the tunnel face versus a fixed tunnel face, through the Tunnel designer's Sequencing mode.

See also