In this movie, we will show how to set up a dynamic calculation of traffic loads. The loads will be measured on an asphalt plate and on a pipeline running underneath the road.
This movie will show the setup of multiple dynamic loads that "move" in time. The input of these moving dynamic loads is done via commands as generated in an Excel file and using the commands runner. At the end of the movie, the results and the response of the system are shown in an animation.
3D Modelling of Train Induced Moving Loads on an Embankment
[Publications]
Practical use of the commands runner
[Videos]
Practical use of the commands runner: Pile field
Practical use of the commands runner: using a batch file to run commands