A backtied circular slurry trench wall was originally envisaged for the construction pit enclosure of a sewage lift station in Budapest. Using the PLAXIS and AXIS program packages the possibility of building a stable enclosure without backties or bracing was demonstrated. The structure was built safely according to the proposed design and has been operated ever since without any sign of distress. The experiences gained in using the programs and the proposed improvements are described hereunder.