Hello, I am new to gINT. I am trying to make a Fence Diagram with 12 boreholes that were grouted in 5m to 10m intervals. I want to show the volume of grout for each interval on the Fence diagram. I added a field ("Grout Volume") in the borehole Lithology for the volume for each interval.
So far I have been able to get all 12 boreholes with intervals, and color coded based on grout type (I created a new MATERIAL graphic for grout types). I\
How do I get the field Grout Volume to show up in the Fence diagram, centered in the correct interval?
Thank you for all your help.
Hi John,
I think from what you describe all you need is to place a text vs depth entity next to the fence post in report design. I am making the assumption that the grout volume matches your lithology layer and that is why you added a field to the Lithology table. If it does not then it may be better to create a Grout volume table with depth, bottom, volume and type fields.
in report design fences .. goto the fence menu at the top choose text vs depth add the text expression ..Depth and bottom fields that are appropriate for your tables and fields. Make it Center Middle Aligned. In my example the table was Lithology and the fields are example names, then place the entity next to the stick.
I would also recommend the Fence Design tutorial