Currently my fence is setup to show multiple water strikes and rises, but how do i get this in numeric order so my strike and rise share the same numeric number?
i.e. 1st water strike - rise should be 1 not a 2, 2nd water strike, strike and rise should show as 2 and so on. Below is a snip of my fence diagram, I assume I have to modify the depth expression back in report design?