Hello!
I am building a fence report and I am trying to pull a depth from a table to use as the top depth to my vertical lines on a bar graph. The problem is that I cannot get the program to pull the minimum depth where there is data for the bar graph. I want to start the top of the vertical lines at 7, but everything I have put in just starts the lines at zero. How would I get this to work?
Thanks!