Plotting a well that is screened at two separate intervals

Hello, 

I'm trying to construct a borehole log for a pumping well that was screened at two separate intervals (i.e., 1 well pipe, and 2 screened intervals).

Below is an image of the well construction...

If I add another line with a distinct Well ID in the "Well" tab, gINT produces a borehole log with two well pipes in one borehole.

If I add another line with the same Well ID (as it should be), gINT gives me an error about duplicate Well IDs.

Thoughts?

Parents Reply Children
No Data