Hello,
I'm trying to construct a borehole log for a pumping well that was screened at two separate intervals (i.e., 1 well pipe, and 2 screened intervals).
Below is an image of the well construction...
If I add another line with a distinct Well ID in the "Well" tab, gINT produces a borehole log with two well pipes in one borehole.
If I add another line with the same Well ID (as it should be), gINT gives me an error about duplicate Well IDs.
Thoughts?
As Kirk said, depends on how your data structure and report are set up. If you use a descrete stacked symbol set up, the following post describes methods to show the different borehole diameters in your sketch.
https://communities.bentley.com/products/geotechnical1/f/geotechnical-forum/231948/tapered-borehole#719146