When you are monitoring some parameter over time, the data can be plotted against time on a graph. gINT Graphs can output this plot in a Graph report using a date-time graph.To report the water-level elevation measured over time in several monitoring wells, for example, a date-time graph is used:
For each well, water level elevation is plotted versus each date it was measured, using the hydrometer readings data recorded in the project database. A table of minimum and maximum levels and other well data is presented below the plot.