If you're a civil engineer working in the field of site design, you have likely had the need to size detention ponds to attenuate postdevelopment peak flow down to predevelopment rates. Did you know that CivilStorm, SewerGEMS and PondPack include a powerful tool called PondMaker, which can help you quickly design a detention pond? Just how fast? In this short video, watch PondMaker design a pond and outlet in under five minutes.
To learn more, check out the additional sources in the "See Also" section below.
This video covers the following:• Pond and Outlet design in PondMaker• The Unit Hydrograph runoff method is used. PondMaker steps with Modified Rational Method are slightly different.• Graphing pre vs post results Applicable products/versions:• CivilStorm and SewerGEMS 08.11.04.54 and later• PondPack V8i and later
Want to see more? Sign in, click the More button and turn blog notifications on. Or, subscribe to our Youtube Channel.
For a copy of the example model file used in this, click the below link. Note that this is saved in the CONNECT Edition, version 10.00.00.40 and cannot be opened in earlier versions.
Quick pond design Model.zip
This video is part of a growing library of useful information designed to provide effective tips and information about time-saving product features within Bentley’s Haestad | Hydraulics and Hydrology products. Be sure to check back frequently to view the latest video. Better yet, subscribe to this blog by turning Notifications On. Jesse DringoliTechnical Support ManagerBentley Systems, Inc.
Using PondMaker
How can I set up pre and post development scenarios for use in pond design with PondMaker?
What do all the lines in PondMaker step 4 represent?
PondPack Learning Path (LEARN Server - contact your Bentley Account Manager if you do not have access)
Pond Design from Start to Finish with PondPack (Webinar Recording)