Dear Sir,
This scheme represents the lifting of water from reservoir (R-1) to Tank ( T-1). The flow through the pipe shall be 2200 cu.m/h. Hence the design flow of pump shall be 2200 cu.m/h. Please guide us the steps to determine the design head, shutoff head of the pump.
The model is attached for your reference.
Regards,
Sujoy De
Model- Pump head Determination.rar
Answer Verified By: Scott Kampa
Please see the below article in our wiki to supplement Tom's answer:
General Pump Selection Process
Jesse DringoliTechnical Support Manager, OpenFlowsBentley Communities Site AdministratorBentley Systems, Inc.