Dear All,
Again, I strucked up in performing Age analysis. I considered a demand pattern named as 'DC' without any time duration for it. while validating the following error message i received. if i changed it as fixed demand pattern it works well.
41566 "min 150 mm dia ADD + 10% for Age" "Pattern" "3427" "DC" (N/A) "Not enough points in pattern. At least two unique points are required." Pressure Engine
I need to run age analysis with DC option or any other solution for this?
Thanks,
RSP
Hello RSP,
A demand needs to have at least two points in order to be valid. Even if the pattern is basically a multiplier (or a pattern that is the same over a 24 hour simulation), similar to the following, you need at least two points in it.
Time from Start (hours) Multiplier1.000 0.80024.000 0.800
If this doesn't help, could you send a screenshot of what the pattern looks like?
Thank you.
Regards,
Scott Kampa
Bentley Technical Support
Thanks Scott. It worked.
There is an another problem of no flow in the pumps header beacause of that very high water Age .This issue i posted as a new thread.
Answer Verified By: RSP