Good afternoon,
I am trying to set up a network in PondPack where all pre-development basins are all being collected at one outfall/culvert but in the post-development, three of the basins are being routed through a pond and then to the culvert.
The problem I am having is that the pre-development flows are being calculated and generating a target peak flow, but the post-development flows are only calculating the basins routing to the pond and continuing to give me an error stating that the calculated peak flow is less than the target peak flow and thus no pond is needed.
Is there a way for me to set up the network so that the target and calculated flows are being calculated from the difference of the total flow to the culvert in the pre and the post, rather than the entirety of the pre-developement vs the post-development basins to the pond?