Hi,
In my sewerGems model I have a pump station with a force main of 2km and 1050 mm diameter. This force main is discharging in a chamber that is also the start of an inverted siphon (to cross a river). I am using swmm engine. In the scenario summary, there is a small continuity and routing error (±1%) but there is a high percentage of non-converging (40%). I'm trying to find the reason of this non-converging high percentage. Here are my questions:
Thank you