Scada element graph problem

Hi,

I'm using Scada element in Sewergems to compare my results with field data. Unfurtunately when I graph all my Scada element only 24h is shown but the calculation options are set to 48h. I'm using SWMM solver and end date\ end time for duration type . I looked at the data in the graphs and there is 48h data (see below).

Do you know why ?

Thank you

Marie-Joelle

Parents Reply
  • Hello,

    2 years ago to solve this problem, I had to use SewerGEMS 32 bits version and Excel 1997 version as historic file Scada Element. I’m now using Sewergems (CONNECT Edition) 64 bits and Excel 2010, and I have the same problem : when I graph a Scada element only 24h of the historical data is shown but the entire simulation results are shown (48h). I’ve checked the dates, start/end simulation time.

    Do you know why ? Is there a way to solve this problem ?

    Thanks !