I am having issues in AutoCAD when trying to move a junction to a new location. The junction is attached to three pipes, but when I move it only the endpoints of two pipes move with the junction. The third pipe remains as previously drawn, creating a connectivity gap:
How do I fix this?
Ken,
There a few different solutions for this problem that can be found in this wiki link. Try the synchronize drawing and follow that with the compact database steps found toward the bottom of the wiki.
Regards,
Mark
Just a quick additional suggestion specific to AutoCAD - check if the pipe is in a locked layer, and see how it behaves when opened in the Standalone version of WaterGEMS. If needed, you can send a copy of the model and CAD drawing using these steps:
Sharing Hydraulic Model Files on the Haestad Forum
Jesse DringoliTechnical Support Manager, OpenFlowsBentley Communities Site AdministratorBentley Systems, Inc.