What is the difference between assigning the demand directly at Tank vs assigning demand at downstream node in EPS

In the water distribution model of feeder main, where I have given separate inlet at the tank, what difference it makes if I assign the demand at tank or if I assign the demand at the D/S node instead of tank?

Which option shall be used in which case? 

What is the significance of having the demand allocation option at the tanks?