Hello,
I have a working 36hr EPS hydraulic scenario and would like to setup a transient scenario for a pump trip. My attempt in doing so has not been successful and I was seeing my zone draining and my pump station (that feeds the zone) dead heading, with flow reversing through the pump towards the boundary conditions.
Regards,
Youssef