How to connect a in-line storage tank into two pumps

Hello, I'm modelling a large size existing water supply network with many boosters through the network. There is also a tank with a pumping station through the network to provide water for a further network. So my question is how can I model a the the connected pumps to the storage tank?

I put the following conditions for both pumps :

If the tank level is below 10%, then pump status is OFF, else: Pump status is ON

But no flow is discharged by the pumps:

the error messages are:

Pump "PMP-22 cannot deliver flow or head."

and  "Tank T1-Tech Institute 1 is full."