Hydraulic Line or Depth/ Rise (%) is not meeting the capacity of sewer pipes

I was using SewerGems model to optimize the sewerage network. In the first run, it gave the diameters to the sewer pipes as per their capacities and constraints specified. After optimizing I modified the slopes of the pipes to limit the depth of the complete sewer system. But at some places, the Hydraulic line is exceeding the capacity of the pipes but in downstream the hydraulic line seems to be meeting the capacity of the pipe whereas the overall flow remains same in downstream with same diameter.
I am attaching the snapshot of profile as well as flex table for reference.

Profile snapshotFlex Table sorted upstream to downstream