I am working on a model in which many of the junctions are not on the existing pipeline. So, I want to attach the existing junction(which is not attached to the pipeline) to the existing pipeline by not creating a new junction on the pipeline and splitting it.
Hello,
There is a tool called batch pipe split that could be used to connect the junctions to the pipes. The junctions would need to be within a given tolerance for this to work. If the junctions are far from the pipes, you may want to review the source data for the pipes and junctions.
Regards,
Scott
Answer Verified By: Jesse Dringoli
Thank you, It really helped me.