Hello,
Recently I am modeling two rainwater gravity drainage systems with two separate Outfalls. My task is to connect them together and to analyze the hydraulic flow distribution after the connection.
My question is: is there any suggestions or rules for selection of the connecting element?
Which link element should be used for this kind of connections? Can these systems be connecting with the same element that is used in the system, for example Conduit?
Is there any known routine how to model this kind of connections? And what should be considered during the modeling?