Hello Everyone
I was testing if I put high demand in junction if will give me a negative flow but that nut happen note that I know that the tank can deliver this flow
for example, I put 1000(GPM) in a junction that connected to the tank I already know that he can't deliver this flow with only about 3 m high difference but when I open the pipe table I see that the pipe deliver 1000(GPM)
how can that happen?