Load on wetwell without using manhole load and gravity pipe

Hello Bentley Community,

I am trying to lift wastewater load using wetwell and pump and force main, but I need to put manhole before wetwell and put the load for spill in wetwell. Is there anyway that I can put my load directly to wetwell and the pump to second point?

Parents
  • Muhammad,

    Which product and version are you using, and which solver? For example SewerCAD CONNECT Edition 10.03.04.53, or the Implicit solver in SewerGEMS CONNECT Edition 10.03.04.53.

    You should be able to enter sanitary loads directly in the wetwell properties without having to use a manhole and conduit upstream. For example for SewerGEMS you can modify the included Sample-3 or Sample-4 (located in the Samples subfolder within the SewerGEMS installation folder) and you'll see that it computes without a problem.

    If you have tried this and encountered a problem, please elaborate and/or provide a copy of the model for review: Sharing Hydraulic Model Files on the OpenFlows Forum


    Regards,

    Jesse Dringoli
    Technical Support Manager, OpenFlows
    Bentley Communities Site Administrator
    Bentley Systems, Inc.

  • Jesse,

    I'm using SewerCAD CONNECT Edition 10.03.04.53. Thanks for your reply and its working fine.