<?xml version="1.0" encoding="UTF-8" ?>
<?xml-stylesheet type="text/xsl" href="https://communities.bentley.com/cfs-file/__key/system/syndication/rss.xsl" media="screen"?><rss version="2.0" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:slash="http://purl.org/rss/1.0/modules/slash/" xmlns:wfw="http://wellformedweb.org/CommentAPI/"><channel><title>Load on wetwell without using manhole load and gravity pipe</title><link>https://communities.bentley.com/products/hydraulics___hydrology/f/haestad-hydraulics-and-hydrology-forum/230236/load-on-wetwell-without-using-manhole-load-and-gravity-pipe</link><description>Hello Bentley Community, 
 I am trying to lift wastewater load using wetwell and pump and force main, but I need to put manhole before wetwell and put the load for spill in wetwell. Is there anyway that I can put my load directly to wetwell and the pump</description><dc:language>en-US</dc:language><generator>Telligent Community 12</generator><item><title>RE: Load on wetwell without using manhole load and gravity pipe</title><link>https://communities.bentley.com/thread/713135?ContentTypeID=1</link><pubDate>Tue, 24 May 2022 06:14:52 GMT</pubDate><guid isPermaLink="false">6dad98f5-dbc9-4c4d-a9ba-e9da8dc6aa8e:48562c3d-a8eb-4ad5-ad9f-1a7d7861f049</guid><dc:creator>Sushma Choure</dc:creator><description>&lt;p&gt;This information has been added to following wiki, for simplification.&amp;nbsp;&lt;/p&gt;
&lt;p&gt;&lt;a href="/products/hydraulics___hydrology/w/hydraulics_and_hydrology__wiki/20815/understanding-the-sanitary-load-control-center-and-inflow-control-center" rel="noopener noreferrer" target="_blank"&gt;Understanding the Sanitary Load Control Center and Inflow Control Center&lt;/a&gt;&amp;nbsp;&lt;/p&gt;&lt;div style="clear:both;"&gt;&lt;/div&gt;</description></item><item><title>RE: Load on wetwell without using manhole load and gravity pipe</title><link>https://communities.bentley.com/thread/713129?ContentTypeID=1</link><pubDate>Tue, 24 May 2022 04:49:55 GMT</pubDate><guid isPermaLink="false">6dad98f5-dbc9-4c4d-a9ba-e9da8dc6aa8e:c65b3962-da4f-489d-9124-9675e31372b5</guid><dc:creator>Muhammad Armaghan</dc:creator><description>&lt;p&gt;Jesse,&lt;/p&gt;
&lt;p&gt;I&amp;#39;m using&amp;nbsp;&lt;span&gt;SewerCAD CONNECT Edition 10.03.04.53. Thanks for your reply and its working fine.&lt;/span&gt;&lt;/p&gt;&lt;div style="clear:both;"&gt;&lt;/div&gt;</description></item><item><title>RE: Load on wetwell without using manhole load and gravity pipe</title><link>https://communities.bentley.com/thread/713041?ContentTypeID=1</link><pubDate>Mon, 23 May 2022 14:08:50 GMT</pubDate><guid isPermaLink="false">6dad98f5-dbc9-4c4d-a9ba-e9da8dc6aa8e:59998d2e-a161-4bb1-a76b-e231986ec28d</guid><dc:creator>Jesse Dringoli</dc:creator><description>&lt;p&gt;Muhammad,&lt;/p&gt;
&lt;p&gt;Which product and version are you using, and which solver? For example SewerCAD CONNECT Edition 10.03.04.53, or the Implicit solver in SewerGEMS &lt;span&gt;CONNECT Edition 10.03.04.53&lt;/span&gt;.&lt;/p&gt;
&lt;p&gt;You should be able to enter sanitary loads directly in the wetwell properties without having to use a manhole and conduit upstream. For example for SewerGEMS you can modify the included Sample-3 or Sample-4 (located in the Samples subfolder within the SewerGEMS installation folder) and you&amp;#39;ll see that it computes without a problem.&lt;/p&gt;
&lt;p&gt;&lt;img alt=" " border="0" src="/cfs-file/__key/communityserver-discussions-components-files/5925/WWLoads.png" /&gt;&lt;/p&gt;
&lt;p&gt;If you have tried this and encountered a problem, please elaborate and/or provide a copy of the model for review: &lt;a href="/help/w/be_communities_help/32255/sharing-hydraulic-model-files-on-the-openflows-hydraulics-hydrology-forum"&gt;Sharing Hydraulic Model Files on the OpenFlows Forum&lt;/a&gt;&lt;/p&gt;&lt;div style="clear:both;"&gt;&lt;/div&gt;</description></item></channel></rss>