Visual depiction of allocated service connections to manhole in SewerGEMS

Greetings,

I am trying to automate the allocation of wastewater discharges from plots to manholes in SewerGEMS, and for that, I am using LoadBuilder with the options "Point load data" and "Nearest node".  The plots wastewater service connections are included as a point shapefile that is entered in the LoadBuilder tool.  I believe that this way, the LoadBuilder tool will select the service connections closest to a given manhole and allocate them to that manhole.  Still, I need to verify the result and have a visual way of checking whether the service connection points have been allocated to the correct manhole.  How can I do that?

Thanks and best regards,

Amine