Hi,
I'm conducting a pilot study to create a SCADA-connected model. I have successfully connected the model to the SCADA data at the balancing and service tanks for comparison purposes. The upstream boundary of the simulation will be a treatment plant, which provides flow and pressure data from a pipeline outlet that fed from a set of pumps to a balancing reservoir. I aim to run a live and continuous simulation that uses the flow and pressure data and projects results 3-5 hours ahead of the current boundary conditions.
I require assistance to properly configure the model to run automatically.