• 70% Analysis in SewerGEMS

    Hi All! I am looking to analyse a sewer model to see if flows are exceeding 70% in certain pipes. I think I need to edit the "Design Percent Full (%)" in a flex table or the "local pipe constraints" drop down, however, even when I ensure my model…