• Why does EPS analysis does not giving conduit sizing on increasing loading in sewergems?

    I am increasing the loading but conduit dia remain same in EPS analysis, why this is happning?
  • how to set a flushing manhole in sewergems?

    flushing manhole load is only generated in morning how i can assign load the for 3 to 2 hours in system. using EPS.