You are currently reviewing an older revision of this page.
In the Demand Control Center, some of the junctions are listed multiple times. Why is this?
This occurs when the junction has more than one demand applied. For instance, suppose that a junction is listed three times. If you view the Demand Collection section in the junction Properties dialog box, there will be three listings.
In other words, a node can have a composite demand where the total demand is made up of multiple individual demands, such as from different sources that are lumped together into the single node element.
How to Edit Demands Globally
Unit demand control center Vs. Demand control center