Is it possible to set the design event throughout the day i.e. 24 hours, instead of just one particular time step?
Darwin designer gives solution for a single time-step, as its not feasible to compute Darwin Designer for the EPS run, throughout the day.
What can be done is, analyze where are the net(cumulative) flows occurring and what time step and simulate that. You may consider at least (maximum hour) and (minimum hour) to cover the peak flow situations and then compute the Darwin Designer for that time-step.
Results can be rechecked with the EPS run by exporting the best solution and check whether they are acceptable or not.