STRUCTURAL ENTERPRISE & ITS ATTACHED SOFTWARE

I would like to know the limited usage of (RAM) Connection Design in Structural Enterprise. I am wondering my Connection Design is incomplete, thus, my Design Work Flow is affected. I have to go out side the Work Flow and use LIMCON, it makes too long of design process. I am afraid if I check the box after RAM Connection in the license Configuration of STAAD PROV8i , I might be charged of over usage. I understand when you are in Structural Enterprise, connection design (RAM) is included. Infact, in 2017 the first year of my Structural Enterprise, i was able to use Connection Design completely, but now it is incomplete. I cant use the smart connection and other connection such as base plate etc. Please enlighten me.

Regards,

Engr. Dosmedo G. Tabrilla, MPSA

Phil. Public Safety College

Parents Reply Children
No Data