Hi,
could anybody reprodude the issue I am facing with copying/moving more than 2000 elements at once? By elements I mean a number shown in "Selection Set" near the symbol cursor, on the very bottom of Microstation window.
1. In DGN file, select more than 2000 elements and choose Manipulate/Move or Copy from Ribbon.
2. See how many elements was copied/moved (should be every element of course no matter how many are they).
3. Exactly 2001 elements are copied or moved, other remains in previous place.
I have files that works just fine in latest v8i but not in Connect. I can provide that file(s) if needed. I was able to reproduce it also with freshly created file using delivered seed.
Tested on Microstation Connect U12 and some PowerPlatform-based (U12) electrical software. For testing purposed I have installed them on another machine with no customization.
Regards, Wojtek
Hi WojtekM,
Would it be possible for you to Capture and Provide a Microsoft Process Monitor (procmon) log, zip and post it to the Secure File Upload area for review?
Providing these details will likely provide a very clear indication of one or more contributing factors to the issue(s) you are experiencing and allow us to make either proper recommendations or, aid in our filing any defect(s) required.
Thank you in advance,
Bob
Hi Robert Hook
I have uploaded file as described. It's based on current promis.e software, because that's what I have at computer now, I can provide later the same files with Powerdraft from another machine if needed.
You will find Process Monitor Logs + video (screen record) separately for copying and moving. I have also attached the DGN file.
The file name is CopyIssue.zip
--
Best regards, Wojtek
SW: Promis.e 08.11.13.96/23.00.00.46
any news in that case? Do you need any more information/testing?