I have a job where the architect is using multiple call outs for the same material.it's all based if it's on the floor ,furniture, ceiling, counters ,walls etc.
When I create my shop drawings I think I plan on using the architects call outs but I want to go back and find and replace the cryptic call outs with the material call outs actually call out 1 call out per material. How can I do this in a script. Then add that script into batch mode